Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Mar 15, 2021     12-3 Empennage Fairing Step 5-11 - (24 hours)       Category: Tail Feathers
Work performed during the whole week.
Trimmed the stabilizer fairing (wrong cut, ended up with too big distance to elevator counterbalance). Decided to reconstruct the trimmed away part using foam and epoxy and fiberglass. Three layer on both fairings and some sanding and flox. End result is within tolerance, may need some additional final adjustment after final empennage assembly and rigging. Added aluminum strips to strengthen the fairing. Matchdrilled and final drill #30 for pop rivets.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.